Pre-construction

Preliminary analysis

It is essential to carefully study every detail from the very early stages of project definition, with continuous checks during design and development. By aligning expectations and making them realistic from the start, you eliminate the risk of errors and mishaps during construction.

 

These incidents can be costly to correct and cause unwanted delays.

Our approach

At Edil GT, we are committed to reducing your worries by evaluating every aspect of your project with meticulous attention.

 

Our process includes:

​

  1. In-depth analysis of project documents 

  2. Definition of detailed budgets to maintain control of each phase of the project

  3. Development of operational programs with precise timing

  4. Pre-order of materials and components that require long delivery times

  5. Obtaining the necessary work permits (for construction projects abroad)

​

Our goal in the pre-construction phase is to ensure that every detail of the project is carefully analyzed and properly accounted for, every risk mitigated and every opportunity maximized. Our meticulous approach at this crucial stage lays the foundation for a successful, efficient and profitable project.